Heater Service & Troubleshooting

Skip to content
Menu
  • Home
  • Contact Us

Category: A.O. Smith

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – Upper Probe Open

Posted on October 3, 2023

The control system has detected over 56,000 ohms from the Temperature Probe on top of the water heater. Check Temperature Probe plug and socket connection…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – UIM Display Is Blank

Posted on October 3, 2023

On/Off is turned off Water heater is not plugged in Tripped Breaker – Blown Fuses 120 VAC power supply problems 24 VAC power supply problems…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – WIRING DIAGRAM

Posted on October 3, 2023

Service Notes – Polarity & Ground This water heater is polarity and ground sensitive. The control system will lock out and display a fault message…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – UIM

Posted on October 3, 2023

The UIM (User Interface Module) is the display on the front of the water heater. The UIM’s major components include a Circuit Board with LCD…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – Control System Features

Posted on October 3, 2023

Advanced Diagnostics: Plain english text based diagnostic information (fault messages) on board to help equipment owners accurately describe the reason for a given lock out…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – IGNITER CURRENT TEST

Posted on October 3, 2023

GNITER CURRENT TEST The water heater covered by this Service Manual uses a hot surface igniter (HSI). The control system CCB (page 35) powers the…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – FLAME SENSING TEST

Posted on October 3, 2023

To prove burner flame during ignition the control system monitors flame sensing current through the flame sensor. It is a DC micro amp (?A) current…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – AIR PRESSURE SWITCH TESTING

Posted on October 3, 2023

Air pressure switch testing involves three procedures: • Normal State Test • Operational State Test • Pressure Test Normal State Test Turn off power and…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – AIR PRESSURE SWITCH OPERATION

Posted on October 3, 2023

The control system monitors the “state” of the air pressure switches individually through three separate circuits (see wiring on diagram page 39). The “state” of…

A.O. Smith

A.O. Smith BTX-100/GDHE-50 – AIR PRESSURE SWITCHES

Posted on October 3, 2023

Air pressure switch technical bulletins TB-A023-06 and TB-S023-06 explain air pressure switch construction and test procedures in detail. These technical bulletins are available on the…

Posts navigation

Previous Page Page 1 Page 2 Page 3 … Page 6 Next Page

Pages

  • Contact Us

Recent Posts

  • How to Recalibrate a Thermostat
  • Solenoid Valves for Furnaces: A Basic Guide
  • Fuel Oil Burner Nozzles: What They Are and How They Work
  • Remote Bulb Temperature Control: A Basic Introduction
  • How to Clean Oil Burner Nozzle

Categories

  • A.O. Smith
  • Bradford White RG150T6N
  • Coal Firing
  • DIY
  • Gas and Oil Controls
  • Gas Burners
  • Honeywell Thermostat Manuals
  • Non-Condensing Models
  • Oil Burner
  • Steam and Hydronic Line
  • Thermostats and Humidistats
  • Troubleshooting
  • Valve
  • Wiring and Controls
© Copyright 2025 – Heater Service & Troubleshooting
Wisteria Theme by WPFriendship ⋅ Powered by WordPress

Terms and Conditions - Privacy Policy